Data warehouse modernization services

The warehouse built ten or fifteen years ago still holds some of your most valuable business logic, but the signs of age are hard to ignore: overnight loads that run into the working day, hardware or licence renewals that cost more each cycle, a shrinking pool of people who understand the ETL code, and no easy way to feed streaming data or machine learning. Data warehouse modernization keeps what is valuable, replaces what holds you back, and does it without a gap in reporting.

2020Founded
50+Team members
100+Projects delivered
4Countries with clients

Overview

Data warehouse modernization services

Code Xenix modernizes ageing data warehouses: assessment, migration to cloud platforms, ETL redesign and parallel validation, without disrupting your reporting.

Code Xenix plans and delivers modernisation projects, from the first inventory of your existing warehouse to the day the old platform is switched off.

Data warehouse modernization services we offer

Modernisation assessment

We inventory tables, ETL jobs, stored procedures, reports and their real usage, measure data volumes and performance, and identify what to migrate, redesign or retire.

Target platform design

A modern architecture on a cloud warehouse or lakehouse, with storage, compute, integration and BI layers chosen for your workloads. See cloud business intelligence for the reporting side.

Schema and code conversion

Translation of legacy SQL dialects, stored procedures and ETL packages to the new platform, using automated conversion tools where they are reliable and manual rework where they are not.

ETL to ELT redesign

Replacing tightly coupled ETL tools with modular, version-controlled transformations that run inside the warehouse and are covered by automated tests.

Data migration and validation

Bulk and incremental transfer of historical data, followed by row counts, checksums and report-level comparisons between old and new platforms.

Report and BI migration

Repointing or rebuilding reports and semantic models on the new warehouse, and retiring duplicates along the way.

Post-migration optimisation

Query tuning, cost monitoring and adoption of capabilities the old platform lacked, such as streaming ingestion or data sharing.

Modernisation approaches

  • Lift and shiftmove schemas and code with minimal change; fastest, but carries old design problems to the new platform
  • Re-platform with targeted fixesmigrate the logic while fixing the worst performance and quality issues; the most common middle path
  • Re-architectredesign models and pipelines for the new platform; most effort, but the biggest long-term gains
  • Phased hybridrun old and new side by side, moving domain by domain until the legacy system can be retired

We usually recommend a mix: re-architecting the areas causing the most pain and re-platforming the rest.

How we work

  1. Discover

    Automated scanning of the legacy warehouse combined with interviews to understand which outputs the business relies on.

  2. Decide

    Target architecture, migration approach per domain, cost model and a wave plan that avoids busy reporting periods such as year-end.

  3. Prepare

    Landing zone, security, connectivity and a pilot migration of one small domain to prove the method.

  4. Migrate in waves

    Each wave moves data, logic and reports for one area, then runs old and new in parallel until results match.

  5. Cut over

    Users and downstream systems switch to the new platform, with a rollback plan for each wave.

  6. Decommission and optimise

    Legacy hardware and licences retired; the new platform tuned for cost and speed.

Benefits

  • Shorter load windowsElastic compute processes loads in a fraction of the time, so data is ready when people start work.
  • Lower long-term costHardware refreshes and expensive licence renewals give way to usage-based pricing.
  • Easier to maintainModular, tested, version-controlled code is easier to change and to hand over between engineers.
  • New data typesSemi-structured data, event streams and external data sets become practical to use.
  • Ready for AIData scientists and AI tools can work directly with governed warehouse data.

Why us

Why Code Xenix

  • Building software since 2020, with a team of 50+ people across Lahore, New Jersey and Malta
  • 100+ projects delivered for clients in the USA, Malta, Saudi Arabia and Pakistan
  • Clients come back: MD Billing Pro, Nova Health and Nexus92 have all returned to us for follow-on projects
  • Parallel running and automated comparison are standard in every wave, so differences are found before users see them.
  • We plan decommissioning from day one, so you actually stop paying for the old platform.

Industries we serve

Related

More Data warehousing services

FAQ

Frequently asked questions

Get answers to common questions about Data warehouse modernization services.

How do we know it's time to modernise?

Common triggers are an upcoming hardware or licence renewal, load jobs missing their windows, rising maintenance effort, key staff leaving, or new needs such as real-time data and AI that the current platform can't support.

Will reporting be interrupted during migration?

It shouldn't be. Old and new platforms run in parallel for each migrated area, and users switch only after results have been reconciled. Each wave also has a rollback plan.

Can stored procedures and ETL packages be converted automatically?

Partly. Conversion tools handle much of the routine SQL, but complex procedural logic, vendor-specific functions and poorly documented jobs need manual review. The assessment estimates the split for your code base.

How long does modernisation take?

It depends on the number of objects, jobs and reports, and on the approach. A small warehouse can move in a single phase; larger ones are migrated in waves over a longer period, with value delivered after each wave.

Do we have to move to the cloud?

No, though most modernisation projects do. If regulation or existing investments require it, we can modernise on-premises or in a hybrid set-up. For cloud moves on AWS, our AWS migration services cover the wider infrastructure.

Is your warehouse holding you back?

Tell us which platform you run today, its approximate size and what's prompting the change. We'll reply within 1 business day with a suggested assessment scope. If you're starting fresh rather than migrating, see our data warehousing services.

See our work Start a project