# AWS migration services

Data centre contracts end, hardware reaches end of life, and the cost of keeping old servers running keeps rising. Those are the usual reasons companies decide to move to AWS. What decides whether the move goes smoothly is less visible: knowing every dependency between systems, picking the right migration path for each application and planning cut-overs so customers barely notice.

2020 Founded

50+ Team members

100+ Projects delivered

4 Countries with clients

Overview

## AWS migration services

Code Xenix migrates applications, databases and Windows workloads to AWS in planned waves, with tested cut-overs, rollback plans and cost tuning after the move.

Code Xenix plans and carries out migrations to Amazon Web Services, from a handful of servers to a full data centre exit. We move workloads in controlled waves, test each one before switching over, and keep a rollback route open until you're confident in the result.

## AWS migration services we offer

### Migration assessment and business case

We inventory servers, applications, databases and their dependencies, size the AWS target, and compare current running costs with projected AWS costs over several years.

### Migration strategy per workload

For each application we choose one of the standard paths: rehost (lift and shift), replatform (small changes such as moving to a managed database), refactor (re-architect for cloud-native services), repurchase (switch to SaaS), retain or retire.

### Landing zone setup

Before any workload moves, we build the AWS foundation: account structure, networking, connectivity to your offices or data centre, identity, logging and security guardrails.

### Application and server migration

We replicate servers with AWS Application Migration Service, rebuild applications where needed, and run test cut-overs before the real one.

### Database migration

We move databases with AWS Database Migration Service, using continuous replication to keep downtime short, and convert schemas between engines where you want to move off commercial licences.

### Data and storage transfer

We move file shares and large data sets with AWS DataSync, Transfer Family or the Snow family of devices for very large volumes or limited bandwidth.

### Post-migration optimisation

After cut-over we right-size instances, apply savings plans, set up monitoring and backups, and identify which workloads are worth modernising next.

## Migrating Windows and.NET workloads

Many organisations run a large share of their estate on Windows Server, SQL Server and.NET. These workloads can move to AWS in several ways:

- **Rehost on Amazon EC2** fastest route, keeping existing licences where your agreements allow it
- **Managed SQL Server on Amazon RDS** removes patching and backup work for databases
- **Move from.NET Framework to modern.NET on Linux** reduces licence costs and opens up containers and serverless; our [.NET developers](https://codexenix.com/services/developers-dotnet/) handle the code changes
- **Managed Active Directory and file services** AWS Directory Service and Amazon FSx for Windows File Server for dependencies that must stay Windows-based

We review your Microsoft licensing position early, since it often has a large effect on the business case.

## How we work

### Assess

1. Discovery tools and interviews map servers, applications and dependencies. You receive an inventory, cost comparison and recommended approach per workload.

### Mobilise

2. Landing zone built, migration team and runbooks prepared, and a pilot workload moved to prove the process.

### Plan waves

3. Applications grouped by dependency and risk, with a schedule agreed with business owners and cut-over windows booked.

### Migrate

4. Each wave is replicated, tested in AWS, cut over and monitored, with a rollback plan ready until sign-off.

### Optimise

5. Costs, performance and security reviewed after each wave, and the on-premises footprint decommissioned.

### Modernise

6. Candidates for refactoring are prioritised for the next phase. See [application modernization](https://codexenix.com/services/application-modernization/).

## Benefits of migrating to AWS

- **No more hardware refresh cycles** Capacity is provisioned when you need it, not bought years ahead.
- **Better resilience** Workloads can run across multiple Availability Zones with automated backups and recovery.
- **Cost transparency** Spend is visible per application and team, and can be reduced with right-sizing and commitments.
- **Faster environments** New test or development environments take minutes instead of a hardware order.
- **A path to modernisation** Once in AWS, applications can adopt managed databases, containers and serverless step by step.

Why us

## Why Code Xenix

- Building software since 2020, with a team of 50+ people across Lahore, New Jersey and Malta
- 100+ projects delivered for clients in the USA, Malta, Saudi Arabia and Pakistan
- Clients come back: MD Billing Pro, Nova Health and Nexus92 have all returned to us for follow-on projects
- Every wave has a written rollback plan and a test cut-over before the live one.
- We look past the move itself: application changes and longer-term modernisation are planned together. See our wider [AWS consulting](https://codexenix.com/services/cloud-aws/) and [application migration](https://codexenix.com/services/application-migration/) services.

## Industries we serve

### [Finance](https://codexenix.com/industries/finance/)

migrations planned around regulatory and data residency requirements

### [Logistics](https://codexenix.com/industries/logistics/)

moving tracking and warehouse systems with minimal operational downtime

Related

## More AWS consulting services

### [AWS DevOps services](https://codexenix.com/services/cloud-aws-devops/)

Code Xenix sets up AWS DevOps: CI/CD pipelines, infrastructure as code, automated testing and monitoring, …

FAQ

## Frequently asked questions

Get answers to common questions about AWS migration services.

**How long does an AWS migration take?**

A small estate of a few applications moves considerably faster than a large one. Larger migrations are planned in waves over several months. The assessment gives you a realistic schedule based on your actual dependencies.

**How much downtime should we expect?**

For most workloads, only the final cut-over, which is often minutes to a few hours, because servers and databases are replicated continuously beforehand. We schedule cut-overs in agreed low-traffic windows.

**Should we lift and shift or re-architect?**

Lift and shift is the fastest way out of a data centre and suits stable applications. Re-architecting costs more upfront but lowers running costs and improves scalability for applications that are still evolving. Many companies rehost first and modernise selected applications afterwards.

**What happens to our software licences?**

Some licences can be brought to AWS, others need to be replaced or switched to licence-included pricing. We review your agreements during assessment, as licensing can change the business case considerably.

**Can you migrate from Azure, Google Cloud or another hosting provider?**

Yes. The process is similar: assessment, landing zone, wave planning and migration, with tools chosen for the source environment.

## Planning a move to AWS?

Tell us what you run today and your target date, and we'll reply within 1 business day with a suggested assessment scope.

---

Source: https://codexenix.com/services/cloud-aws-migration/
